Refine your search:     
Report No.
 - 
Search Results: Records 1-15 displayed on this page of 15
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Horonobe Underground Research Laboratory Project Investigation Report for the 2022 Fiscal Year

Nakayama, Masashi

JAEA-Review 2023-032, 159 Pages, 2024/02

JAEA-Review-2023-032.pdf:19.37MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant technologies for geological disposal of high-level radioactive waste through investigating the deep geological environment within the host sedimentary rocks at Horonobe Town in Hokkaido, north Japan. In the fiscal year 2022, we continued R&D on "Study on near-field system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behaviour of sedimentary rock to natural perturbations". These are identified as key R&D on challenges to be tackled in the Horonobe underground research plan for the fiscal year 2020 onwards. Specifically, "full-scale engineered barrier system (EBS) performance experiment" and "solute transport experiment with model testing" were carried out as part of "Study on near- field system performance in geological environment". "Demonstration of engineering feasibility of repository technology" and "evaluation of EBS behaviour over 100$$^{circ}$$C" were addressed for "Demonstration of repository design options". A study on "Understanding of buffering behaviour of sedimentary rock to natural perturbations" was also implemented in two areas, "evaluation of intrinsic buffering against endogenic and exogenic processes" and "development of techniques for evaluating excavation damaged zone (EDZ) self-sealing behaviour after backfilling". The Horonobe International Project (HIP) was initiated in February 2023 to promote research and development in collaboration with national and international organizations.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation program for the 2023 fiscal year

Nakayama, Masashi

JAEA-Review 2023-019, 70 Pages, 2023/11

JAEA-Review-2023-019.pdf:6.83MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant technologies for geological disposal of high-level radioactive waste through investigating the deep geological environment within the host sedimentary rocks at Horonobe Town in Hokkaido, north Japan. In the fiscal year 2023, we continue R&D on "Study on near-field system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behaviour of sedimentary rocks to natural perturbations". These are identified as key R&D challenges to be tackled in the Horonobe underground research plan for the fiscal year 2020 onwards. In the "Study on near-field system performance in geological environment", we conduct the coupled analysis on the full-scale engineered barrier system performance experiment and test the coupled simulation code through comparison with different simulation codes in the international DECOVALEX-2023 collaboration project. Borehole investigations are also carried out for solute transport experiments in the Koetoi Formation. As for "Demonstration of repository design concept", we carry out in situ experiments and data analysis on concrete deterioration under the subsurface conditions. Geophysical surveys are also carried out around an experimental tunnel to be newly excavated at the 350m gallery and characterise the initial conditions of the excavation damaged zone. For the "Understanding of buffering behaviour of sedimentary rocks to natural perturbations", we analyse the results of the hydraulic disturbance tests conducted in previous years and understand the relationship between rock stress / stress state and fault / fracture hydraulic connectivity. Concerning the construction and maintenance of the subsurface facilities, the 350 m gallery is extended and shafts are sank to a depth of 500 m.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation program for the 2022 fiscal year

Nakayama, Masashi

JAEA-Review 2022-026, 66 Pages, 2022/11

JAEA-Review-2022-026.pdf:12.31MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies for geological disposal of High-level Radioactive Waste through investigations of the deep geological environment within the host sedimentary rock at Horonobe Town in Hokkaido, north Japan. In fiscal year 2022, we continue to conduct research on "Study on near-field system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behaviour of sedimentary rocks to natural perturbations", which are the important issues shown in the Horonobe underground research plan from fiscal year 2020. The main studies to be conducted in fiscal year 2022 are as follows. As "Study on near-field system performance in geological environment", we will continue to the test under the simulated condition in which the heat generation by the high-level radioactive waste has subsides in the full-scale engineered barrier system (EBS) performance experiment. We will also conduct solute transport experiment with model testing that take into account the effects of organic matter, microbes, and colloids, and initiate borehole investigation to evaluate solute transport experiments on fractures distribute in Koetoi formation. As "Demonstration of repository design concept", we will continue experiment and analysis of concrete deterioration in the underground environment as a demonstration of remote technique for emplacement and retrievable. As a demonstration of the closure techniques, laboratory tests will be continued to investigate the mechanism of bentonite runoff behaviour, which could be a factor in changing the performance of backfill material, and to expand data on swelling and deformation behaviour. In addition, in-situ borehole closure tests will be conducted to evaluate the applicability of the closure method. As "Understanding of buffering behaviour of

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation report for the 2021 fiscal year

Nakayama, Masashi

JAEA-Review 2022-025, 164 Pages, 2022/11

JAEA-Review-2022-025.pdf:12.25MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA). The main aim of this project is to enhance the reliability of relevant disposal technologies for geological disposal of high-level radioactive waste through a comprehensive research and development (R&D) program in the deep geological environment within the host sedimentary rock at Horonobe in Hokkaido, north Japan. In fiscal year 2021, we continued R&D on three important issues specified in the "Horonobe Underground Research Plan from Fiscal Year 2020", which involve "Study on near-field system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behaviour of sedimentary rock to natural perturbations". Specifically, "full-scale engineered barrier system (EBS) performance experiment" and "solute transport experiment with model testing" were carried out as part of "Study on near-field system performance in geological environment". "Demonstration of engineering feasibility of repository technology" and "evaluation of EBS behaviour over 100$$^{circ}$$C' were addressed for "Demonstration of repository design options". A study on "Understanding of buffering behaviour of sedimentary rock to natural perturbations" was also implemented in two areas, "evaluation of intrinsic buffering against endogenic and exogenic processes" and "development of techniques for evaluating excavation damaged zone (EDZ) self-sealing behaviour after backfilling". The results of the R&D, along with those obtained in other departments of JAEA, will reinforce the technical basis for both repository implementation and safety regulation. For the sake of this, we will steadily proceed with this project in collaboration with relevant organizations and universities both domestically and internationally and also widely publish the plans and results of the R&D to ensure their transparency and technical reliability.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation report for the 2020 fiscal year

Nakayama, Masashi

JAEA-Review 2021-053, 133 Pages, 2022/02

JAEA-Review-2021-053.pdf:14.45MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA). The main aim of this project is to enhance the reliability of relevant disposal technologies for geological disposal of high-level radioactive waste through a comprehensive research and development (R&D) program in the deep geological environment within the host sedimentary rock at Horonobe in Hokkaido, north Japan. In fiscal year 2020, JAEA continued R&D on three important issues specified in the "Horonobe Underground Research Plan from Fiscal Year 2020", which involve "Study on nearfield system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behavior of sedimentary rock to natural perturbations". Specifically, 'full scale engineered barrier system (EBS) experiment' and 'solute transport experiment' were carried out as part of "Study on near-field system performance in geological environment". 'Development and testing of EBS emplacement / retrieval and tunnel closure technologies' and 'evaluation of EBS behavior over 100$$^{circ}$$C' were addressed for "Demonstration of repository design options". A study on "Understanding of buffering behavior of sedimentary rock to natural perturbations" was also implemented in two areas, 'evaluation of hydromechanical responses of faults to water pressure changes' and 'development of techniques for evaluating self-sealing behavior of an excavation damaged zone after backfilling'. The results of the R&D, along with those obtained in other departments of JAEA, will reinforce the technical basis for both repository implementation and safety regulation. For the sake of this, JAEA will steadily proceed with this project in collaboration with relevant organizations and universities both domestically and internationally and also widely publish the plans and results of the R&D to ensure their transparency and technical reliability.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation program for the 2021 fiscal year

Nakayama, Masashi

JAEA-Review 2021-009, 54 Pages, 2021/07

JAEA-Review-2021-009.pdf:5.02MB

The Horonobe URL Project is being pursued by the JAEA to enhance the reliability of relevant disposal technologies for geological disposal of High-level Radioactive Waste through investigations of the deep geological environment within the host sedimentary rock at Horonobe Town in Hokkaido, north Japan. In 2021 fiscal year (2021/2022), JAEA continue to conduct research on "Demonstration of EBS in geological environment", "Demonstration of disposal concept", and "Validation of buffer capacity of the sedimentary rock to tectonism", which are the important issues shown in the Horonobe underground research plan after 2020 fiscal year. The main studies to be conducted in 2021 fiscal year are as follows. As "Demonstration of EBS in geological environment", we will shift to the test under the condition that the influence of heating is eliminated in the full scale EBS experiment. As "Demonstration of disposal concept", as a demonstration of the closure techniques, it details the conditions under which long-term transitions in the tunnel and surrounding bedrock have a significant impact on safety assessments. And we will continue engineering scale experiment to confirm the workability and performance of plugs and laboratory tests to examine the interaction between backfilling materials and buffer materials. As "Validation of buffer capacity of the sedimentary rock to tectonism", we will analyze the results of the hydraulic disturbance test and continue to study the hydraulic disconnection of faults/fissures in the Wakkanai Formation. As an advancement of technology for investigating and evaluating areas where the flow of groundwater is extremely slow, a boring exploration will be conducted to confirm the three-dimensional distribution of the fossil seawater area.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation report for the 2019 fiscal year

Nakayama, Masashi; Saiga, Atsushi

JAEA-Review 2020-042, 116 Pages, 2021/01

JAEA-Review-2020-042.pdf:10.33MB

The Horonobe Underground Research Laboratory Project will be conducted in three phases, namely "Phase 1: Surface-based investigations", "Phase 2: Construction Phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). This report summarizes the results of the investigations for the 2019 fiscal year (2019/2020). The investigations, which are composed of "Geoscientific research" and "R and D on geological disposal technology", were carried out according to "Horonobe Underground Research Laboratory Project Investigation Program for the 2019 fiscal year". The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organizations.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation program for the 2020 fiscal year

Nakayama, Masashi; Saiga, Atsushi

JAEA-Review 2020-022, 34 Pages, 2020/11

JAEA-Review-2020-022.pdf:3.99MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies for geological disposal of High-level Radioactive Waste through investigations of the deep geological environment within the host sedimentary rock at Horonobe Town in Hokkaido, north Japan. The investigations will be conducted in three phases, namely "Phase 1: Surface-based investigations", "Phase 2: Construction phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). According to the research plan described in the 3rd Mid- and Long- term Plan of JAEA, "Demonstration of EBS in geological environment", "Demonstration of disposal concept", and "Validation of buffer capacity of the sedimentary rock to tectonism" are important issues of the Horonobe URL Project, and schedule of future research and backfill plans of the URL will be decided by the end of 2019 Fiscal Year. JAEA summarizes the research and development activities of the important issues carried out during the 3rd Mid- and Long-term Plan, and set out three important issues after 2020 fiscal year. After consultation with Hokkaido and Horonobe town, JAEA formulated the Horonobe underground research plan after 2020 fiscal year within the 3rd and 4th Mid- and Long-term Plan. This report summarizes the investigation program for the 2020 fiscal year (2020/2021).

JAEA Reports

Synthesis report on the R&D for the Horonobe Underground Research Laboratory; Project carried out during fiscal years 2015-2019

Nakayama, Masashi; Saiga, Atsushi; Kimura, Shun; Mochizuki, Akihito; Aoyagi, Kazuhei; Ono, Hirokazu; Miyakawa, Kazuya; Takeda, Masaki; Hayano, Akira; Matsuoka, Toshiyuki; et al.

JAEA-Research 2019-013, 276 Pages, 2020/03

JAEA-Research-2019-013.pdf:18.72MB

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies for geological disposal of High-level Radioactive Waste through investigations of the deep geological environment within the host sedimentary rock at Horonobe Town in Hokkaido, north Japan. The investigations will be conducted in three phases, namely "Phase 1: Surface based investigations", "Phase 2: Construction phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). According to the research plan described in the 3rd Mid- and Long- term Plan of JAEA, "Near-field performance study", "Demonstration of repository design option", and "Verification of crustal-movement buffering capacity of sedimentary rocks" are important issues of the Horonobe URL Project, and schedule of future research and backfill plans of the project will be decided by the end of 2019 Fiscal Year. The present report summarizes the research and development activities of these 3 important issues carried out during 3rd Medium to Long-term Research Phase.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation program for the 2019 fiscal year

Aoyagi, Kazuhei

JAEA-Review 2019-008, 20 Pages, 2019/07

JAEA-Review-2019-008.pdf:3.33MB

As part of the research and development program on the geological disposal of high-level radioactive waste (HLW), the Horonobe Underground Research Center, a division of the Japan Atomic Energy Agency (JAEA), is implementing the Horonobe Underground Research Laboratory Project (Horonobe URL Project) with the aim at investigating sedimentary rock formations. According to the research plan described in the 3rd Mid- and Long- term Plan of JAEA, "Near-field performance study", "Demonstration of repository design option", and "Verification of crustal-movement buffering capacity of sedimentary rocks" are the top priority issues of the Horonobe URL Project, and schedule of future research and backfill plans of the project will be decided by the end of 2019 Fiscal Year. The Horonobe URL Project is planned to extend over a period of about 20 years. The investigations will be conducted in three phases, namely "Phase 1: Surface-based investigations", "Phase 2: Construction phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). This report summarizes the investigation program for the 2019 fiscal year (2019/2020). In the 2019 fiscal year, investigations in "geoscientific research", including "development of techniques for investigating the geological environment", "development of engineering techniques for use in the deep underground environment" and "studies on the long-term stability of the geological environment", are continuously carried out. Investigations in "research and development on geological disposal technology", including "improving the reliability of disposal technologies" and "enhancement of safety assessment methodologies", are also continuously carried out.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation report for the 2017 fiscal year

Hanamuro, Takahiro; Saiga, Atsushi

JAEA-Review 2018-027, 125 Pages, 2019/02

JAEA-Review-2018-027.pdf:21.79MB

The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely "Phase 1: Surface-based investigations", "Phase 2: Construction Phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). This report summarizes the results of the investigations for the 2017 fiscal year (2017/2018). The investigations, which are composed of "Geoscientific research" and "R&D on geological disposal technology", were carried out according to "Horonobe Underground Research Laboratory Project Investigation Program for the 2017 fiscal year". The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organizations.

JAEA Reports

Scenario development on application of engineering technology for geological disposal; Study of influence of earthquake at site construction, operation and closure stages and that impact on safety functions after closure of disposal facility (Contract research)

Takai, Shizuka; Takayama, Hideki*; Takeda, Seiji

JAEA-Data/Code 2016-020, 40 Pages, 2017/03

JAEA-Data-Code-2016-020.pdf:2.42MB

In this report, another group of scenarios for occurrence of earthquake at construction stage, operation stage and closure stage of disposal facility was presented. At first, we compiled information about damage cases of tunnel by earthquake and analyzed conditions for occurrence of damage. Base on this result and the previous report, information of influence of the accidents and human factors on safety functions and information of FEP about THMC variation, we specified events to be considered, which occur by earthquake and influence engineering barriers, natural barriers and long-term safety after closure stage of disposal facility. We compiled influence of the events on safety functions after closure stage of disposal and showed the chains of the influence on long-term safety as scenarios. These results were integrated as a database that could support development of scenarios caused by application of engineering technologies to geological disposal.

JAEA Reports

Research on engineering technology in the full-scale demonstration of EBS and operation technology for HLW disposal; Research report in 2014 (Joint research)

Kobayashi, Masato*; Saito, Masahiko*; Iwatani, Takafumi*; Nakayama, Masashi; Tanai, Kenji; Fujita, Tomoo; Asano, Hidekazu*

JAEA-Research 2015-018, 14 Pages, 2015/12

JAEA-Research-2015-018.pdf:5.43MB

JAEA and RWMC concluded the letter of cooperation agreement on the research and development of radioactive waste disposal in April, 2005, and have been carrying out the collaboration work based on the agreement. JAEA have been carrying out the Horonobe URL Project which is intended for a sedimentary rock in the Horonobe town, Hokkaido, since 2001. In the project, geoscientific research and research and development on geological disposal technology are being promoted. Meanwhile, The Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry has been promoting construction of equipments for the full-scale demonstration of engineered barrier system and operation technology for high-level radioactive waste disposal since 2008, to enhance public's understanding to the geological disposal of HLW, e.g. using underground facility. RWMC received an order of the project in fiscal year 2014 continuing since fiscal year 2008. Since topics in this project are included in the Horonobe URL Project, JAEA carried out this project as collaboration work continuing since fiscal year 2008. This report summarizes the results of the research on engineering technology carried out in this collaboration work in fiscal year 2014.

JAEA Reports

Research on engineering technology in the full-scale demonstration of EBS and operation technology for HLW disposal; Research report in 2013 (Joint research)

Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Sawada, Sumiyuki*; Asano, Hidekazu*; Saito, Masahiko*; Yoshino, Osamu*; Kobayashi, Masato*

JAEA-Research 2014-031, 44 Pages, 2015/03

JAEA-Research-2014-031.pdf:16.11MB

Japan Atomic Energy Agency (JAEA) and Radioactive Waste Management Funding and Research Center (RWMC) concluded the letter of cooperation agreement on the research and development of radioactive waste disposal in April, 2005, and have been carrying out the collaboration work based on the agreement. JAEA have been carrying out the Horonobe Underground Research Laboratory (URL) Project which is intended for a sedimentary rock in the Horonobe town, Hokkaido, since 2001. In the project, geoscientific research and research and development on geological disposal technology are being promoted. Meanwhile, the government (the Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry) has been promoting construction of equipments for the full-scale demonstration of engineered barrier system (EBS) and operation technology for high-level radioactive waste (HLW) disposal since 2008, to enhance public's understanding to the geological disposal of HLW, e.g. using underground facility. RWMC received an order of the project in fiscal year 2012 (2011/2012) continuing since fiscal year 2008 (2008/2009). Since topics in this project are included in the Horonobe URL Project, JAEA carried out this project as collaboration work continuing since fiscal year 2008. This report summarizes the results of engineering technology carried out in this collaboration work in fiscal year 2013. In fiscal year 2013, emplacement tests using buffer material block for the vertical emplacement concept were carried out and visualization tests for water penetration in buffer material were carried out.

JAEA Reports

Horonobe Underground Research Laboratory Project; Investigation report for the 2013 fiscal year

Hanamuro, Takahiro

JAEA-Review 2014-039, 69 Pages, 2014/10

JAEA-Review-2014-039.pdf:43.66MB

The Horonobe Underground Research Laboratory Project is planned to extend over a period 20 years. The investigations will be conducted in three phases, namely "Phase 1: Surface-based investigations", "Phase 2: Construction Phase" (investigations during construction of the underground facilities) and "Phase 3: Operation phase" (research in the underground facilities). This report summarizes the results of the investigations for the 2013 fiscal year (2013/2014). The investigations, which are composed of "Geoscientific research" and "R&D on geological disposal technology", were carried out according to "Horonobe Underground Research Laboratory Project Investigation Program for the 2013 fiscal year". The results of these investigations, along with the results which were obtained in other departments of Japan Atomic Energy Agency (JAEA), are properly offered to the implementations and the safety regulations. For the sake of this, JAEA has proceeded with the project in collaboration with experts from domestic and overseas research organisations.

15 (Records 1-15 displayed on this page)
  • 1